Skip to content
Qualtex Logo
  • Home
  • About Us
    • Our Team
    • Our Journey
    • Capabilities
    • Testimonials
  • Services
    • Alignment
    • Balancing
    • Workshop
    • Vibration Analysis
    • Pump Services
    • On Site
  • Projects
  • Products
    • All Products
    • Pumps
    • Fans
    • Rotary Unions
    • Valves
  • News
  • Videos
  • Contact Us
  • Careers
  • Home
  • About Us
    • Our Team
    • Our Journey
    • Capabilities
    • Testimonials
  • Services
    • Alignment
    • Balancing
    • Workshop
    • Vibration Analysis
    • Pump Services
    • On Site
  • Projects
  • Products
    • All Products
    • Pumps
    • Fans
    • Rotary Unions
    • Valves
  • News
  • Videos
  • Contact Us
  • Careers
+64 7 958 6354
info@qualtex.co.nz

Delivering Reliability Through Precision: Multi-Stage Vertical Turbine Pump Rebuild

Home  /  Projects  /  On Site  /  Delivering Reliability Through Precision: Multi-Stage Vertical Turbine Pump Rebuild

Delivering Reliability Through Precision: Floway Multi-Stage Vertical Pump Rebuild

CASE STUDY – Pumps: Floway Multi-Stage Vertical Turbine Pump Rebuild — Geothermal Power Station

Industry: Geothermal Power Generation Services: On-Site, Workshop, Pump Overhaul Equipment: Floway Multi-Stage Vertical Turbine Pump


The Situation

A New Zealand geothermal power station required the complete overhaul of a Floway multi-stage vertical turbine pump — a critical asset in their generating process. The work was required at short notice, placing a premium on both technical capability and mobilisation speed.

The Challenge

Vertical turbine pumps of this type require precise measurement and assembly across multiple stages. Dimensional errors compound through the assembly, making the overhaul technically demanding. The criticality of the asset meant there was limited tolerance for extended downtime or a substandard outcome.

What Qualtex Did

As the exclusive New Zealand distributor for Trillium Flow Technologies, including the Floway VTP range, Qualtex had direct access to OEM technical knowledge and parts. The scope included on-site precision measurement and careful pump extraction, full workshop overhaul with component-level inspection and assessment, and on-site reinstallation and commissioning.

Every stage of the rebuild was carried out to exacting tolerances. Our team’s familiarity with the Floway platform allowed us to work efficiently without compromising accuracy.

The Outcome

The pump was returned to service within the required timeframe, with seal leakage risks significantly reduced and the equipment restored to specification. The client can expect an extended service interval and reduced total cost of ownership compared to the pre-overhaul condition.

PrevPreviousLarge HVAC fan with high vibrations – cracked shaft?
We're ready

Contact us today

+64 7 958 6354
info@qualtex.co.nz
Qualtex Logo White

Rotating Equipment Specialists

© Copyright 2026 Qualtex New Zealand Ltd. All Rights Reserved.
  • Log In
Website by Maick Design
  • Delivering Reliability Through Precision: Multi-Stage Vertical Turbine Pump Rebuild
  • Home
  • About Us
    • Our Team
    • Our Journey
    • Capabilities
    • Testimonials
  • Services
    • Alignment
    • Balancing
    • Workshop
    • Vibration Analysis
    • Pump Services
    • On Site
  • Projects
  • Products
    • All Products
    • Pumps
    • Fans
    • Rotary Unions
    • Valves
  • News
  • Videos
  • Contact Us
  • Careers
  • Home
  • About Us
    • Our Team
    • Our Journey
    • Capabilities
    • Testimonials
  • Services
    • Alignment
    • Balancing
    • Workshop
    • Vibration Analysis
    • Pump Services
    • On Site
  • Projects
  • Products
    • All Products
    • Pumps
    • Fans
    • Rotary Unions
    • Valves
  • News
  • Videos
  • Contact Us
  • Careers
+64 7 958 6354